All Hokie, All the Time. Period. Presented by

Virginia Tech Baseball Board

48zip

Joined: 10/07/1999 Posts: 81140
Likes: 10477


This is all I saw in the minutes (inside)


. 2) Baseball - Includes building renovation and an addition to
provide for improved baseball team and training facilities. An A/E contract
executed with Koonce Associates for bridging documents. Design-Build
procurement is in progress.
[Post edited by 48zip at 07/13/2016 08:31AM]

(In response to this post by VTurficus)

Posted: 07/13/2016 at 08:26AM



+0

Insert a Link

Enter the title of the link here:


Enter the full web address of the link here -- include the "http://" part:


Current Thread:
 
  
Any update on stadium construction? -- VTurficus 07/11/2016 11:25PM
  This is all I saw in the minutes (inside) -- 48zip 07/13/2016 08:26AM

Tech Sideline is Presented By:

Our Sponsors

vm307