All Hokie, All the Time. Period. Presented by

The Lounge Board

TomTurkey

Joined: 10/11/1999 Posts: 88535
Likes: 23270


There are specs for form (shoring) removal and subsequent load application


Of course, the load bearing elements require more stringent control of curing and strength; usually monitored by control break cylinders for quality and strength if full, say 28 day (bell curve probability stuff) is to be shortcutted. The quality cylinders are broken to ensure the concrete does not set up too quickly, resulting in a weaker matrix.

(In response to this post by PhotoHokieNC)

Posted: 10/15/2019 at 12:51PM



+0

Insert a Link

Enter the title of the link here:


Enter the full web address of the link here -- include the "http://" part:


Current Thread:
 
  
From the NO Hard Rock Collapse- ha -- bigbadbird 10/15/2019 11:30AM
  Any news on why the building just essentially fell over? -- PhotoHokieNC 10/15/2019 12:15PM
  "Pride" will get to the bottom of it.** -- IB4TECH 10/15/2019 6:50PM
  Aerosmith ** -- Newt 10/15/2019 3:05PM
  I heard it passed all the inspections ** -- bigbadbird 10/15/2019 12:20PM
  Yup ** -- PhotoHokieNC 10/15/2019 12:18PM

Tech Sideline is Presented By:

Our Sponsors

vm307