For a 12x10, that somewhere between 1.5 and 2.5 yards of concrete
Unless you have about half of a high school football team to help with the manual labor, that is an awful lot of 80# bags of concrete to buy/move/mix/pour. I'd seriously think about getting a ready mix truck to deliver over mixing that much myself.
|
(
In response to this post by MP4VT2004)
Posted: 05/06/2021 at 12:54PM